Part throttle jetting

250 2c- the Wee-WeeVees
Post Reply
User avatar
Parker3865
Posts: 154
Joined: 13 Sep 2022 18:16
Location: Brentwood
Contact:

Part throttle jetting

Post by Parker3865 »

I have done about 800 miles on my rebuilt 250 2c. I had noticed that it was very fluffy at part throttle (if it was a 2 stroke I'd say it was 4 stroking) and a stutter when opening tbe throttle. I have dropped the slide needle one notch and it is running much much better.
However! When adjusting the idle screw at tickover any more than 1/4 out makes no more difference. I believe I have the standard idle jets; 40. I have the shorter mixture screws and have read Mark's article in ATG 222 (thanks to Julian for that) and I assume it should be more like 1 1/2 turns out. F.Y.I. I have the blue scooter transducers and I think I have the timing correct. Currently using superunleaded.
FINALLY: the question I have read elsewhere on the forum that people have jetted down the idle jet; what size might be suitable?
Attachments
2.5mm needle
2.5mm needle
IMG_20250326_144937.jpg (446.86 KiB) Viewed 1378 times
Idle needle
Idle needle
IMG_20250326_144939.jpg (471.27 KiB) Viewed 1378 times
Morini 250 2c rebuilt from a box of bits.
Steve Brown
Posts: 1566
Joined: 12 Nov 2007 23:44
Location: Leicestershire

Re: Part throttle jetting

Post by Steve Brown »

As yours is already a small-ish 40 I'd say not much less! 35 for instance would be a big % difference. Before you try that consider that the needle adjustment has been fruitfull and that maybe the slide cutaway is worth adjusting? A few of us have found raising the cutaway has helped a lot, as little as 0.5mm at a time. I'd also say check the fuel level first, the float position is easier to do but still doesn't tell you the actual fuel level. There are Dellorto docs somewhere that tell you how high it should be, something like 5mm below the float bowl joint face.
All donations to the rest home for old Camels, Leicestershire.
BarryCambs
Posts: 44
Joined: 23 Sep 2019 12:49
Location: Cambridge

Re: Part throttle jetting

Post by BarryCambs »

Both the table on the archived Netherlands site and one sent to me by Euro Carbs say 40 jet size. Mine was fitted with 42 for some reason, before I got it. The problem is with anything this age is previous owners could have fiddled with jet/slide/needle sizes trying to correct ignition problems!

https://www.morini-riders-club.com/Nederland/carb.html

Half the older cars or bikes I come into contact with seem to have been 'fiddled' with, so I like to go back to standard and start from there. Bitter experience tells me, don't assume anything!. Just because it says Dellorto on the side, doesn't mean they started life on a Morini and not a Guzzi. On two occasions I've found carbs off completely different things. On one occasion a Dellorto on a Ford Zephyr which while the correct model (but wrong choke size) turned out to be off an Royal Navy generator, as the previous owner was told it would improve the fuel consumption!

Mine's fitted with SWF ignition and pulls well right through the range. I don't know anything about the blue transducers, but I have a pair of virtually new ones from Alesandro in Italy you are welcome to borrow and try.
dellorto_table.png
dellorto_table.png (404.31 KiB) Viewed 1343 times
User avatar
Parker3865
Posts: 154
Joined: 13 Sep 2022 18:16
Location: Brentwood
Contact:

Re: Part throttle jetting

Post by Parker3865 »

Thanks Barry. I put new jets and needles in the carbs when I rebuilt the bike and used the NL website as reference for what I needed. I will check the ignition timing again.
Maybe a trip to visit you needs to happen. Much apreciate the offer of the transducers and would like to try them. Are they for sale?
Morini 250 2c rebuilt from a box of bits.
BarryCambs
Posts: 44
Joined: 23 Sep 2019 12:49
Location: Cambridge

Re: Part throttle jetting

Post by BarryCambs »

Be great to meet up sometime given we're not so far apart. I'll sell the transducers if someone needs them, rather than wanting them for stock. They were only on the bike for 10 miles before I realised that while they corrected the original timing problem, the pickup was dodgy as well. knowing what I know now, I'd have gone straight to SWF or similar from the outset.
Post Reply